预应力钢绞线张拉程序(中跨梁)
一、张拉控制应力计算
N1:δK=0.75Ryb×Ap总×1.01=0.75×1860×3×140×1.01=591.76KN
N2:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
N3:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
(1.01为锚板应力损耗系数)
二、张拉程序
             0   →   10%δK   →   20%δK   →   100%δK(持荷2min锚固)
N1:        0   →   59.18KN  →   118.35KN  →   591.76KN(持荷2min锚固)
N2:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)
N3:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)
三、油表读数
N1: 
1、1#千斤顶   76#油表
0   →   59.18KN  →   118.35KN  →   591.76KN
0   →   2.37MPa  →    4.43MPa  →   20.96MPa
2、0266#千斤顶   40387#油表
0   →   59.18KN  →   118.35KN  →   591.76KN
0   →   1.18MPa  →    2.55MPa  →   19.21MPa
N2: 
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa
2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa
N3: 
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa
2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa
G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线伸长量计算
中跨梁:
N1 X(m) 25.42 含千斤顶工作长度每端0.58m
N2  25.48 
N3  25.17 
N1 θ=L弧/R 0.12218 
N2  0.12218 
N3  0.02443 
N1 KX+μθ 0.0882402 K=0.00251 μ=0.2
N2  0.0883908 
N3  0.0680636 
N1 1-e-(KX+μθ) 0.084459062 
N2  0.084596932 
N3  0.065798963 
N1 1-e-(KX+μθ)KX+μθ 0.957149485 
N2  0.957078474 
N3  0.966727337 
N1 P×[1-e-(KX+μθ)]KX+μθ 560.79 P=585.90KN
N2  747.67 P=781.20KN
N3  755.21 P=781.20KN
N1      Pp×X     As×Ep 17.406 As=140mm2Ep=1.95×105Mpa
N2  17.446 
N3  17.407 
G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线张拉程序(边跨梁)
一、张拉控制应力计算
N1:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
N2:δK=0.75Ryb×Ap总×1.01=0.75×1860×5×140×1.01=986.27KN
N3:δK=0.75Ryb×Ap总×1.01=0.75×1860×5×140×1.01=986.27KN
(1.01为锚板应力损耗系数)
二、张拉程序
             0   →   10%δK   →   20%δK   →   100%δK(持荷2min锚固)
N1:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)
N2:        0   →   98.63KN  →   197.25KN  →   986.27KN(持荷2min锚固)
N3:        0   →   98.63KN  →   197.25KN  →   986.27KN(持荷2min锚固)
三、油表读数
N1: 
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa
2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa
N2: 
1、1#千斤顶   76#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →   3.75MPa  →   7.19MPa  →  34.73MPa
2、0266#千斤顶   40387#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →  1.97MPa  →    4.92MPa  →   32.52MPa
N3: 
1、1#千斤顶   76#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →   3.75MPa  →   7.19MPa  →  34.73MPa
2、2、0266#千斤顶   40387#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →  1.97MPa  →    4.92MPa  →   32.52MPa
G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线伸长量计算
边跨梁:
N1 X(m) 25.57 含千斤顶工作长度每端0.58m
N2  25.58 
N3  25.40 
N1 θ=L弧/R 0.12218 
N2  0.12218 
N3  0.02443 
N1 KX+μθ 0.0886167 K=0.00251 μ=0.2
N2  0.0886418 
N3  0.0686400 
N1 1-e-(KX+μθ) 0.084803699 
N2  0.084826670 
N3  0.066337262 
N1 1-e-(KX+μθ)KX+μθ 0.956971981 
N2  0.956960148 
N3  0.966451950 
N1 P×[1-e-(KX+μθ)]KX+μθ 747.59 P=781.20KN
N2  934.47 P=976.50KN
N3  943.74 P=976.50KN
N1      Pp×X     As×Ep 17.505 As=140mm2Ep=1.95×105Mpa
N2  17.512 
N3  17.561 